black

船舶检验报告

登录

单项选择题

The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.

A.relayed
B.delayed
C.conveyed
D.surveyed

相关考题

单项选择题 Tensile stress is a result of two forces acting in().

单项选择题 Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()

单项选择题 Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.

All Rights Reserved 版权所有©在线考试题库网(zxkao.com)

备案号:湘ICP备14005140号-7

经营许可证号:湘B2-20140064