单项选择题
A.possible
B.impossible
C.proper
D.improper
单项选择题 In securing deck loads for an ocean tow,drill pipe should be().
单项选择题 In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()
单项选择题 In order to minimize the effects of a tender vessel,when carrying a cargo of lumber,you should().