单项选择题
All the damage and shortage,()those incurred after discharge and before delivery to receivers,should be noted in the discharging report.
A.including B.besides C.except D.in addition to
单项选择题 A sling is a device used in().
单项选择题 A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().
单项选择题 Which action will affect the trim of a vessel? ()