black

信息系统项目管理师综合练习

登录

单项选择题

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

相关考题

单项选择题 Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

单项选择题 超出项目经理控制的成本增加因素,除了存款利率、贷款利息和税率外,还包括()。

单项选择题 经济计量分析的工作程序依次是()。

All Rights Reserved 版权所有©在线考试题库网(zxkao.com)

备案号:湘ICP备14005140号-7

经营许可证号:湘B2-20140064