单项选择题
A.takes
B.comes
C.goes
D.gives
单项选择题 The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
单项选择题 The fact that it has become impossible to procure a cargo (),as a rule,relieve the Charterer of liability.
单项选择题 The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.