black

货物装卸货作业

登录

单项选择题

The port clearance for a ship should be granted()the completion of loading or discharging in the port.

A.before
B.when
C.after
D.during

相关考题

单项选择题 The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().

单项选择题 The boom indicator tells the operator at what angle the boom is compared to the().

单项选择题 The boom indicator on a crane will indicate the().

All Rights Reserved 版权所有©在线考试题库网(zxkao.com)

备案号:湘ICP备14005140号-7

经营许可证号:湘B2-20140064