单项选择题
A.person aboard
B.person working on deck
C.crew member
D.None of the above are correct
单项选择题 Deck foam systems,designed to protect cargo areas on tankers built after January 1,1975,must have a supply of foam-producing material to operate the system at its designed rate of foam production for().
单项选择题 Cable tension for catenary calculations is taken at the().
单项选择题 By regulation,life preservers aboard an uninspected towing vessel must be().